Improving Rothes High Street
You've told us that the slabbed area at the Craigellachie end of Rothes High Street could benefit from some improvements. We’d like to make the space more useful and attractive. Please help us understand the community’s wishes for this area of Rothes by taking a few minutes to fill out our short survey.
Ideas from the survey will be discussed with the community who'll be able to vote on the ideas/ project they like best. We'll work alongside community members to deliver the ideas with the most community support.
Read our Housing Engagement Privacy Notice. It tells you how we handle your personal information in line with Data Protection Act 1998 and GDPR.
You've told us that the slabbed area at the Craigellachie end of Rothes High Street could benefit from some improvements. We’d like to make the space more useful and attractive. Please help us understand the community’s wishes for this area of Rothes by taking a few minutes to fill out our short survey.
Ideas from the survey will be discussed with the community who'll be able to vote on the ideas/ project they like best. We'll work alongside community members to deliver the ideas with the most community support.
Read our Housing Engagement Privacy Notice. It tells you how we handle your personal information in line with Data Protection Act 1998 and GDPR.
-
Developing your preferred improvement option
Share Developing your preferred improvement option on Facebook Share Developing your preferred improvement option on Twitter Share Developing your preferred improvement option on Linkedin Email Developing your preferred improvement option linkFollowing the community vote we wanted to share an update on the work underway to progress your preferred improvement option.
What’s been done
- A site visit has taken place to discuss potential designs for the area.
- A draft drawing has been prepared.
- A contractor has visited the site to give rough cost estimates for the works.
- We’re aiming for a design that works well for residents and is welcoming for visitors.
What the early design shows
- A slabbed path from the High Street past residents’ front doors for easy access.
- Rolling grassy areas in the main space.
- Hard‑packed gravel paths running between the grassy areas.
- Native perennial plants in the grassy areas (instead of flower beds) to help with easy maintenance.
- Existing healthy trees kept and included in the grassy areas.
- Existing bushes moved to the edges of the grassed area.
- Benches along the gravel paths, facing away from homes as much as possible.
This is an early draft and may change.
What’s next
- We’re checking with other teams about things like lighting and drainage.
- We’re waiting for cost estimates from the contractor.
- Funding options are being explored.
Once more detailed cost information is available, we’ll be able to give an update on what can be delivered and the next steps in the process.
-
Your preferred improvement option
Share Your preferred improvement option on Facebook Share Your preferred improvement option on Twitter Share Your preferred improvement option on Linkedin Email Your preferred improvement option linkThank you to all those who took the time to vote. We received 81 votes with the most votes (31) going to option 1, shown below.

The Asset team will develop this option in more detail including likely costs. The final project will be shaped by what immediate residents prefer. We'll provide an update soon!
-
Survey Results
Share Survey Results on Facebook Share Survey Results on Twitter Share Survey Results on Linkedin Email Survey Results link
Here's a summary of what you told us about improving this area of Rothes.
Who took part?
- 57 people responded to the survey
- 50 of these respondents live in Rothes (89.3%)
Feelings about the area
Most respondents are unhappy or very unhappy with this area of Rothes
- Very unhappy – 23 (41.1%)
- Unhappy – 19 (33.9%)
- Neutral – 14 (25%)
How the area is used
Most respondents use the area for walking though or don’t use it at all. (Multiple selections allowed).
- Walking through – 35 (62.5%)
- Don’t use it – 20 (35.7%)
- Other uses – 4 (7.1%)
- Meeting people – 2 (3.6%)
- Sitting or taking a break – 1 (1.8%)
Main issues
Top concerns were that the area looks untidy and lacks maintenance. (Multiple selections allowed).
- It looks untidy – 49 (87.5%)
- Lack of maintenance – 47 (83.9%)
- It doesn’t feel welcoming – 40 (71.4%)
- It’s not useful – 31 (55.4%)
- Poor seating – 24 (42.9%)
- Not enough plants or greenery – 30 (53.6%)
- Other – 2 (3.6%)
Improving the area
The most popular improvement was more plants and greenery. (Multiple selections allowed).
- More plants and greenery – 44 (78.6%)
- Increased/better seating – 31 (55.4%)
- Sheltered area – 17 (30.4%)
- Bike racks/facilities – 12 (21.4%)
- Other suggestions – 11 (19.6%)
- Information boards – 8 (14.3%)
Top priorities
When asked to choose one main priority, most respondents chose making the area more attractive and welcoming.
- A more attractive and welcoming area – 43 (78.2%)
- A space that serves a useful purpose – 9 (16.4%)
- A place to relax – 3 (5.5%)
Further comments
Common themes from respondents’ comments include:
- The area looks neglected and doesn’t give a good first impression of Rothes.
- Strong support for green improvements like trees, planters, and grass.
- Concerns about traffic speed, noise, and lack of maintenance.
- Mixed views on social use:
- Some support creating a space for gathering or play.
- Others strongly oppose turning it into a play or social area due to noise and litter concerns.
Other suggestions included:
- Parking space
- Bike/skate ramps
- Drainage improvements
- Traffic calming
- Decorative surfacing
Follow Project
Lifecycle
-
Open
Improving Rothes High Street has finished this stageThis consultation is open for contributions.
-
Under Review
Improving Rothes High Street has finished this stageContributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
-
Voting open
Improving Rothes High Street has finished this stageVote on improvement options.
Any final plans will be shaped by what immediate residents prefer.
-
Under Review
Improving Rothes High Street is currently at this stageVoting is closed. The project team will review the preferred improvement option including costs and report back.
-
Final report
this is an upcoming stage for Improving Rothes High StreetThe final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.
Key Dates
-
03 October 2025
-
31 October 2025
-
14 November 2025